The focus of this Big Bear City Community Services District (BBCCSD) water master plan update has been sources of supply, analyses of the existing system, and hydraulic modeling of the system. Hydrogeologists from Daniel B. Stephens & Associates, Inc. (DBS&A) focused on the water supply sources, primarily on the recharge to the Big Bear Valley groundwater basin. Civiltec Engineering, Inc. (Civiltec) focused on evaluating the physical aspects of the transmission and distribution system, including planned improvements. IDModeling, Inc. (IDM) provided hydraulic computer modeling of the system.

Filename | Size | Date |
---|---|---|
![]() |
22.14 MB | 2019-01-15 |